Skip to main content
SarvanLogistics

Oversized and heavy cargo

Excavators, transformers, plant equipment: three low-⁠bed trailers, a route survey, road permits and an escort car are ours to arrange.

A low-bed trailer carrying a quarry machine

Everything that does not fit a standard trailer belongs here: excavators and bulldozers, transformers, boilers, presses, a factory line. The job starts with a route survey: no truck sets off until bridge capacities, tunnel and cable heights and turning radii have been checked.

What the service includes

  • A route survey with a written report
  • A loading and lashing plan
  • Obtaining the road permits
  • An escort car with amber lights, and a police escort where the permit calls for one
  • A crane and riggers at both ends
  • Cargo insurance at full value

What counts as oversized

What counts as oversized
Length13.6 mup to 14.5 m; longer on an extendable platform
Width2.45 mup to 5.0 m
Height of the cargo2.7 mup to 3.9 m (4.5 m above the road)
Weight22 tup to 60 t

Loads over 60 tonnes or more than 4.5 m high go on a rail well wagon or a modular trailer; the price follows the route survey.

Our low-⁠bed trailers

Our low-bed trailers
3-⁠axle9.3 × 2.55 m, widens to 3.0 m0.90 m36 t
4-⁠axle, extendable9.5 m to 14.5 m × 2.55 m0.85 m48 t
5-⁠axle with a well deck8.5 × 2.75 m0.60 m60 t

How a route survey goes

How a route survey goes
Day 1You send the drawing of the cargo, its weight and centre of gravityA draft route and the choice of trailer
Days 2–3Our engineer drives the route: bridges, cables, turns, the width of the roadMeasurements and photographs
Day 4The report: a route map, cables to be lifted, signs to be taken downA fixed price
Days 5–14We obtain the permits and book the crane and the escortThe date of the move
The day of the moveLoading by day; movement inside towns at night, 23:00–06:00The cargo is on site

Documents you need

  • A drawing of the cargo with its length, width, height and weight
  • The centre of gravity and the lifting and lashing points
  • An invoice or a valuation for the insured value
  • The loading and unloading addresses, with the width and height of each entrance
  • For international moves: the contract and the packing list
Document checklists for every case

Frequently asked questions

How far ahead do I need to book?

Two weeks ahead within Azerbaijan, 3–4 weeks for an international move. Most of that time goes on permits: 5–10 working days at home, longer in transit countries.

Who pays for the works along the route?

Lifting cables, taking signs down and putting them back, and the escort are all inside the fixed price in the report. No extra bill is raised on the day of the move.

Can a machine drive onto the trailer under its own power?

Yes, all our trailers have hydraulic ramps. Tracked and wheeled machines drive on themselves; a machine that does not run is pulled up with a 20-⁠tonne winch.

Describe your cargo and get a price within 2 working hours

From where to where, what it is, its weight and its size: those four are enough. The freight desk answers on weekdays, 09:00–18:00.

Call centre: every day 09:00–20:00

Call usTrackGet a quote