
Steel pipe, cable and polyethylene pipe, made in Azerbaijan
Three plants in Sumgait and Ganja, steel and equipment trading, and our own logistics company. Since 1998.
About the group
We started in 1998, trading rolled steel from one warehouse in Baku. In 2006 we installed our first tube mill in Sumgait. Today the three plants turn out 96,400 tonnes of steel products, 11,800 km of cable and 21,300 tonnes of polyethylene pipe a year.
When a project needs pipe, cable and structures at the same time, we work to one contract and one schedule. Our own logistics company delivers to site.
- In business
- since 1998
- Employees
- 1,086
- Plants
- 2 in Sumgait, 1 in Ganja
- Export
- 6 countries, 28 per cent of output

The group’s companies
Each of the five companies has its own director, sales desk and quality department.
Murov MetalSteel pipes, hollow sections, sheet processing and structuressince 2006312 employees
Murov KabelPower cables from 0.6 to 35 kV, control cables and overhead conductorssince 2011241 employees
Murov PolimerPE100 water and gas pipes, sewer pipes, fittings and geomembranesince 2015178 employees
Murov TradingWholesale of rolled steel, pumps, valves and welding consumablessince 1998152 employees
Murov LogisticsRoad and rail haulage, a bonded warehouse and heavy loadssince 2009143 employees
Projects
Some of the sites we have supplied in the past three years.
2025 · Construction · Alat, Garadagh districtSteel frame for a logistics centre in AlatMurov Metal, Murov Logistics
2025 · Water and gas supply · Saatly and Sabirabad districtsIrrigation main in Saatly and SabirabadMurov Polimer, Murov Logistics
2024 · Energy · Shamkir districtCable for a 110/35/10 kV substation in ShamkirMurov Kabel
28 per cent of what the plants make is exported
In 2025 we shipped 34,400 tonnes to five countries; Uzbekistan was added in 2026. Documents are prepared in Russian and English, and delivery is FCA, CPT or DAP.
Export terms| Country | Exporting | Route and transit time |
|---|---|---|
| Georgiasince 2012 | since 2012 | Rail via Boyuk Kasik: 4 days |
| Türkiyesince 2016 | since 2016 | Road under TIR: 5–6 days |
| Kazakhstansince 2018 | since 2018 | Ferry, Alat to Aktau: 3 days |
| Turkmenistansince 2021 | since 2021 | Ferry, Alat to Turkmenbashi: 2 days |
| Kyrgyzstansince 2024 | since 2024 | Ferry and rail: 12–14 days |
| Uzbekistansince 2026 | since 2026 | Ferry and rail: 9–11 days |

Certificates and testing
Each plant has its own test laboratory. No pipe batch goes to the warehouse without a hydrostatic test, and no cable drum without a high-voltage test; the report travels with the goods.
- ISO 9001:2015Quality management: all group companies
- ISO 14001:2015Environmental management: the three plants
- ISO 45001:2018Occupational health and safety: the three plants and logistics
- EN 1090-2, EXC3Fabrication of steel structures, CE marking
- ISO 3834-2Quality requirements for fusion welding
- IEC 60502-2Type tests for 6–35 kV XLPE cable
News
All news- · ProductionMurov Kabel starts up its second CCV lineThe new line raises annual capacity for XLPE cable up to 35 kV from 1,900 km to 3,400 km.
- · ExportFirst shipment to Uzbekistan: 640 tonnes of PE100 pipePipe from the Ganja plant is going to a water supply project in Tashkent region.
- · QualityMurov Metal renews its EN 1090-2 EXC3 certificateThe audit took two days and recorded no non-conformities. The certificate is valid until August 2029.
Ask for a price and a lead time
Tell us the product, the quantity and where it is going. The sales desk replies within one working day with a price, stock and production time.
Sales: Mon–Fri 09:00–18:00