Skip to main content

Waste treatment

We take drill cuttings, oily soil and oily water from the wells, treat them and hand back the result with a laboratory record.

A day of the crew, 5 people
₼785
Where
Onshore, nearshore
Minimum
5 days
A drilling rig standing in a field

What we do

  • Collection and haulage

    Fluids and cuttings in 10 m³ vacuum tankers, oily soil by truck; every trip with a waybill.

  • Treatment

    Treating cuttings and oily soil, separating and cleaning oily water; recovered oil goes back to the client.

  • Paperwork

    Acceptance notes, accredited laboratory records and a monthly report for environmental inspections.

How a job goes

  1. The waste type and volume are established and a sample goes to the laboratory.
  2. The haulage schedule is matched to the drilling schedule.
  3. After treatment the results are checked by the laboratory and the monthly report goes to the client.

Price

5 days with the usual crew and equipment, within Baku, VAT included. Change the crew, equipment and site for your job in the quote.

Crew: supervisor ×1, helper ×3, HSE adviser ×1₼3,925
KAMAZ 65115 KO-507AM1 · 5 days₼2,100
Mobilisation and demobilisation₼300
Excl. VAT₼6,325
Total incl. VAT₼7,464
Quote for this service

Included

  • A supervisor, 3 helpers and an HSE adviser
  • Vacuum tankers with drivers
  • Laboratory analyses and the monthly report

Not included

  • Gate fee per tonne at the treatment pad (a separate line in the offer)
  • Fuel

Equipment we use on this work

All equipment

Projects

All projects

Questions

How often do you collect oily water?

Usually daily while drilling; we set the schedule by tank size and flow.

Do you take small volumes?

Yes, down to a single tanker trip. The minimum order is one day.

Describe the job, see the price at once

Pick the service, the site and the days: the price is worked out with crew, equipment, mobilisation and VAT. We answer within one working day.

Call usMessage on WhatsAppEquipment hireRequest a quote