
Well services and workover
We service and work over wells with our own rigs and crews, from the Balakhani base to every field on the Absheron peninsula and in the Siyazan, Shirvan and Neftchala districts.
- A day of the crew, 8 people
- ₼1,415
- Where
- Onshore
- Minimum
- 3 days

What we do
Well servicing
Pulling and running tubing and rods, pump changes, bottom-hole washing, clearing paraffin and sand plugs.
Workover
Fishing, restoring casing integrity, recompletion to another zone, suspension and abandonment.
Well kill and cementing
Killing the well with heavy fluid, cement plugs and squeeze isolation with twin-pump NOV units.
Well fluids
Fluids from the well go to our treatment pad by vacuum tanker, with paperwork for every trip.
How a job goes
- A work programme and risk assessment are drawn up from the client’s well file and job plan.
- The rig moves to the well, the pad is accepted and the BOP is tested.
- The crew works two shifts and the client gets a daily report.
- After the job the well is tested and the pad is cleaned and handed back.
Price
5 days with the usual crew and equipment, within Baku, VAT included. Change the crew, equipment and site for your job in the quote.
| Crew: supervisor ×1, driller ×2, floorhand ×4, helper ×1 | ₼7,075 |
|---|---|
| TJ Petro XJ650 · 5 days | ₼17,000 |
| NOV Wilco Twin Cement Pumper · 5 days | ₼14,500 |
| Mobilisation and demobilisation | ₼600 |
| Excl. VAT | ₼39,175 |
| Total incl. VAT | ₼46,227 |
Included
- The rig operator and an 8-person crew on two 12-hour shifts
- BOP, tools and wellhead equipment
- Crew transport up to 80 km from the Balakhani base
Not included
- Kill fluid and cement materials (from the client or at cost)
- Fuel (supplied by the client or billed at cost)
- Well logging
Equipment we use on this work
All equipmentProjects
All projects
Balakhani and Sabunchu fields · 2026 · Onshore
Workover campaign in Balakhani
Well services and workover
146 wells worked over
Questions
How long does a job on one well take?
Servicing usually takes 2 to 4 days, a workover 5 to 15. On the Balakhani campaign the average was 6.2 days.
How deep can you work?
The XJ650 handles 73 mm tubing to 8,500 m; most Absheron wells are shallower than 3,000 m.
Do you work nights?
Yes, on two shifts. Lighting towers go up at the wellhead for the night shift.
Describe the job, see the price at once
Pick the service, the site and the days: the price is worked out with crew, equipment, mobilisation and VAT. We answer within one working day.
