Well services and workover

We service and work over wells with our own rigs and crews, from the Balakhani base to every field on the Absheron peninsula and in the Siyazan, Shirvan and Neftchala districts.

A day of the crew, 8 people
₼1,415
Where
Onshore
Minimum
3 days
A rig on a flat field with site cabins and spoil heaps beside it

What we do

  • Well servicing

    Pulling and running tubing and rods, pump changes, bottom-hole washing, clearing paraffin and sand plugs.

  • Workover

    Fishing, restoring casing integrity, recompletion to another zone, suspension and abandonment.

  • Well kill and cementing

    Killing the well with heavy fluid, cement plugs and squeeze isolation with twin-pump NOV units.

  • Well fluids

    Fluids from the well go to our treatment pad by vacuum tanker, with paperwork for every trip.

How a job goes

  1. A work programme and risk assessment are drawn up from the client’s well file and job plan.
  2. The rig moves to the well, the pad is accepted and the BOP is tested.
  3. The crew works two shifts and the client gets a daily report.
  4. After the job the well is tested and the pad is cleaned and handed back.

Price

5 days with the usual crew and equipment, within Baku, VAT included. Change the crew, equipment and site for your job in the quote.

Crew: supervisor ×1, driller ×2, floorhand ×4, helper ×1₼7,075
TJ Petro XJ650 · 5 days₼17,000
NOV Wilco Twin Cement Pumper · 5 days₼14,500
Mobilisation and demobilisation₼600
Excl. VAT₼39,175
Total incl. VAT₼46,227
Quote for this service

Included

  • The rig operator and an 8-⁠person crew on two 12-⁠hour shifts
  • BOP, tools and wellhead equipment
  • Crew transport up to 80 km from the Balakhani base

Not included

  • Kill fluid and cement materials (from the client or at cost)
  • Fuel (supplied by the client or billed at cost)
  • Well logging

Equipment we use on this work

All equipment

Projects

All projects

Questions

How long does a job on one well take?

Servicing usually takes 2 to 4 days, a workover 5 to 15. On the Balakhani campaign the average was 6.2 days.

How deep can you work?

The XJ650 handles 73 mm tubing to 8,500 m; most Absheron wells are shallower than 3,000 m.

Do you work nights?

Yes, on two shifts. Lighting towers go up at the wellhead for the night shift.