
Cranes and heavy lifting
We lift pump and compressor packages, tank sections and trestle spans: from the lift plan to the foundation, with our own cranes and lowbeds.
- A day of the crew, 4 people
- ₼635
- Where
- Onshore, nearshore
- Minimum
- 1 day

What we do
Lifting
XCMG 25 t and Liebherr 50, 100 and 250 t all-terrain cranes; tandem lifts with two cranes.
Lift plans
Calculations for every lift, crane position and load chart, rigging selection, sign-off through the permit system.
Heavy haulage
Loads up to 50 t on Goldhofer lowbeds, route surveys, night moves with the road police.
How a job goes
- We get the load’s weight, size and lifting points from the client and visit the site.
- A lift plan is written and approved with the client’s engineer.
- On lift day the supervisor briefs the crew, wind is measured and the area is closed.
Price
5 days with the usual crew and equipment, within Baku, VAT included. Change the crew, equipment and site for your job in the quote.
| Crew: supervisor ×1, rigger ×2, helper ×1 | ₼3,175 |
|---|---|
| Liebherr LTM 1100-4.2 · 5 days | ₼11,750 |
| Mobilisation and demobilisation | ₼1,200 |
| Excl. VAT | ₼16,125 |
| Total incl. VAT | ₼19,028 |
Included
- A supervisor, 2 riggers and a helper
- The crane with its operator, slings and spreader beams
- Counterweight trucks and a lift plan for cranes of 100 t and above
Not included
- Fuel
- Foundations and crane mats
- Road permit fees (at cost)
Equipment we use on this work
All equipmentProjects
All projects
Sangachal · 2025 · Onshore
Pump skids built and set in Sangachal
Cranes and heavy lifting, fabrication and welding
3 skids fabricated and tested

Sumgait · 2023 · Onshore
Compressor package set in Sumgait
Cranes and heavy lifting
112 t package weight

Alat · 2022 · Nearshore
Trestle repair at Alat
Fabrication and welding, cranes and heavy lifting, corrosion protection
640 m of trestle repaired
Questions
What is the shortest crane hire?
One 12-hour shift. For the 250 t crane the minimum is 2 days: rigging it up and down takes time.
Do you lift in wind?
Lifting stops above the wind speed the crane maker allows; the schedule allows for it from the start.
Describe the job, see the price at once
Pick the service, the site and the days: the price is worked out with crew, equipment, mobilisation and VAT. We answer within one working day.