
Pipelayer · 40.8 t
Caterpillar PL72
Lökbatan yard · ×2
- with operator
- ₼1,050 / day
- without operator
- ₼820 / day
We lay, replace and repair pipelines: one contractor from trench to hydrotest, with our own equipment and certified welders.

4 to 28-inch flowlines from wells to gathering stations, water and gas lines: trenching, stringing, welding, coating, lowering-in and backfill.
Old lines replaced section by section without long shut-ins: the new section is built alongside, then tied in.
A crew and equipment at the leak within 24 hours: clamps, cut-outs, inspection and testing.
Lines in up to 4 to 5 m of water: pipe welded into strings on the shore, boat support, weather windows in the schedule.
5 days with the usual crew and equipment, within Baku, VAT included. Change the crew, equipment and site for your job in the quote.
| Crew: supervisor ×1, engineer ×1, welder ×4, fitter ×2, rigger ×2, helper ×4, HSE adviser ×1 | ₼13,000 |
|---|---|
| Caterpillar PL72 · 5 days | ₼5,250 |
| Komatsu PC210LC-11 · 5 days | ₼2,800 |
| Lincoln Electric Pipeliner 200D · 5 days | ₼1,425 |
| Mobilisation and demobilisation | ₼2,080 |
| Excl. VAT | ₼24,555 |
| Total incl. VAT | ₼28,975 |

Pipelayer · 40.8 t
Lökbatan yard · ×2

Excavator · 23.2 t
Lökbatan yard · ×2

Welding set · 200 A
Lökbatan yard · ×4

Siyazan district · 2026 · Onshore
Pipelines, inspection and NDT, corrosion protection
18.4 km of 6 to 10-inch flowline replaced

Off Pirallahi island · 2025 · Nearshore
Pipelines, inspection and NDT
2.6 km of 12-inch pipe replaced
A four-welder crew averages 18 to 20 welds a day on 6 to 10-inch pipe; in Siyazan the average was 19.
All are qualified in the 6G position; on every project they test again to the client’s procedure.
Usually the client supplies it. If you prefer, we tender for it and add it to our offer.
Pick the service, the site and the days: the price is worked out with crew, equipment, mobilisation and VAT. We answer within one working day.