
Siyazan district · 2026 · Onshore
Flowline replacement in Siyazan
Pipelines, inspection and NDT, corrosion protection
18.4 km of 6 to 10-inch flowline replaced
Pipelayer · 40.8 t
Mid-size pipelayer for 16 to 28-inch pipe and lowering-in with two or three machines
excl. VAT

Free and busy days from today. Pick a day and the length: the price is worked out below.
October 2026
November 2026
December 2026
| Hire, 5 days₼1,050 / day, with operator | ₼5,250 |
|---|---|
| Mobilisation and demobilisation, 22 km | ₼1,000 |
| Excl. VAT | ₼6,250 |
| VAT 18% | ₼1,125 |
| Total | ₼7,375 |
Fuel not included.
| Year built | 2020 |
|---|---|
| Maximum lifting capacity | 40.8 t (at tipping) |
| Engine | Cat C9.3, 211 hp |
| Comes with | With or without operator; goes to site on our lowbed |
Figures from the maker’s data.
Lökbatan yard
Salyan highway, km 21, Lökbatan settlement, Garadagh district, Baku
Gate: Mon–Fri 07:00–20:00, Sat 08:00–16:00. Dispatcher: around the clock.
Open in Google Maps
Siyazan district · 2026 · Onshore
Pipelines, inspection and NDT, corrosion protection
18.4 km of 6 to 10-inch flowline replaced
