Old flowlines removed and replaced with factory-coated pipe, every weld tested

Some of the Siyazan flowlines dated from the 1970s and had worn down to 3 mm wall in places. The client asked us to remove and replace the lines that connect 42 wells to the gathering stations, test every weld and put the new lines under cathodic protection.
Handed over in 7 months, 11 days ahead of plan; 212,000 man-hours without a lost-time injury.
Replacing the lines without stopping the wells made for a tight schedule, and every week’s plan was met.
The client’s project manager

Pipelayer · 40.8 t
Lökbatan yard · ×2

Excavator · 23.2 t
Lökbatan yard · ×2

Welding set · 200 A
Lökbatan yard · ×4


Off Pirallahi island · 2025 · Nearshore
Pipelines, inspection and NDT
2.6 km of 12-inch pipe replaced

Lökbatan yard · 2025 · Onshore
Fabrication and welding, inspection and NDT, corrosion protection
312 t of piping and steelwork

Shirvan · 2024 · Onshore
Corrosion protection, inspection and NDT
9,800 m² blasted and coated
Pick the service, the site and the length: the price with crew and equipment is worked out at once.