
Siyazan district · 2026 · Onshore
Flowline replacement in Siyazan
Pipelines, inspection and NDT, corrosion protection
18.4 km of 6 to 10-inch flowline replaced
Excavator · 23.2 t
Mid-size excavator for flowline trenches, well pad preparation and backfill
excl. VAT

Free and busy days from today. Pick a day and the length: the price is worked out below.
October 2026
November 2026
December 2026
| Hire, 3 days₼560 / day, with operator | ₼1,680 |
|---|---|
| Mobilisation and demobilisation, 22 km | ₼1,000 |
| Excl. VAT | ₼2,680 |
| VAT 18% | ₼482 |
| Total | ₼3,162 |
Fuel not included.
| Year built | 2019 |
|---|---|
| Operating weight | 23,240 kg |
| Power | 123 kW |
| Comes with | With or without operator; goes to site on our lowbed |
Figures from the maker’s data.
Lökbatan yard
Salyan highway, km 21, Lökbatan settlement, Garadagh district, Baku
Gate: Mon–Fri 07:00–20:00, Sat 08:00–16:00. Dispatcher: around the clock.
Open in Google Maps
Siyazan district · 2026 · Onshore
Pipelines, inspection and NDT, corrosion protection
18.4 km of 6 to 10-inch flowline replaced

Neftchala district · 2024 · Onshore
Waste treatment
21,400 t of drill cuttings treated
