
Siyazan district · 2026 · Onshore
Flowline replacement in Siyazan
Pipelines, inspection and NDT, corrosion protection
18.4 km of 6 to 10-inch flowline replaced
Welding set · 200 A
Diesel welder built for pipeline work: cellulosic root and fill passes
excl. VAT

Free and busy days from today. Pick a day and the length: the price is worked out below.
October 2026
November 2026
December 2026
| Hire, 5 days₼285 / day, with operator | ₼1,425 |
|---|---|
| Mobilisation and demobilisation, 22 km | ₼80 |
| Excl. VAT | ₼1,505 |
| VAT 18% | ₼271 |
| Total | ₼1,776 |
Fuel not included.
| Year built | 2023 |
|---|---|
| Welding output | 200 A, 40 V, 60%; range 40–300 A |
| Engine | Kubota V2403M, 27.8 hp |
| Comes with | Without operator or with a 6G-certified welder |
Figures from the maker’s data.
Lökbatan yard
Salyan highway, km 21, Lökbatan settlement, Garadagh district, Baku
Gate: Mon–Fri 07:00–20:00, Sat 08:00–16:00. Dispatcher: around the clock.
Open in Google Maps
Siyazan district · 2026 · Onshore
Pipelines, inspection and NDT, corrosion protection
18.4 km of 6 to 10-inch flowline replaced

Off Pirallahi island · 2025 · Nearshore
Pipelines, inspection and NDT
2.6 km of 12-inch pipe replaced

Baku · 2021 · Onshore
Engineering and manpower, inspection and NDT
148 people on site on the busiest day

Welding set · 500 A
Lökbatan yard · ×2