
Off Pirallahi island · 2025 · Nearshore
Nearshore pipeline repair at Pirallahi
Pipelines, inspection and NDT
2.6 km of 12-inch pipe replaced
Pipelayer · 18.1 t
Light pipelayer for 6 to 12-inch flowlines and narrow rights of way
excl. VAT

Free and busy days from today. Pick a day and the length: the price is worked out below.
October 2026
November 2026
December 2026
| Hire, 5 days₼720 / day, with operator | ₼3,600 |
|---|---|
| Mobilisation and demobilisation, 22 km | ₼1,000 |
| Excl. VAT | ₼4,600 |
| VAT 18% | ₼828 |
| Total | ₼5,428 |
Fuel not included.
| Year built | 2017 |
|---|---|
| Maximum lifting capacity | 18.1 t (at tipping, ISO 8813) |
| Power | 130 hp |
| Comes with | With or without operator; goes to site on our lowbed |
Figures from the maker’s data.
Lökbatan yard
Salyan highway, km 21, Lökbatan settlement, Garadagh district, Baku
Gate: Mon–Fri 07:00–20:00, Sat 08:00–16:00. Dispatcher: around the clock.
Open in Google Maps
Off Pirallahi island · 2025 · Nearshore
Pipelines, inspection and NDT
2.6 km of 12-inch pipe replaced

Pipelayer · 40.8 t
Lökbatan yard · ×2