Balakhani and Sabunchu fields · Onshore

Workover campaign in Balakhani

Three rigs and three crews brought idle wells back into production over 11 months

Client
A joint venture working old onshore fields
Period
March 2025 – February 2026 (12 months)
Most people on site in a day
58
Man-hours
318,000
Lost-time injuries
0
A rig on a flat field with site cabins and spoil heaps beside it

The brief

More than 170 wells in the Balakhani and Sabunchu fields had stood idle for years. The joint venture picked the most promising and wanted one contractor for the servicing and workover, well kill and cement isolation.

In figures

worked over
146wells
per well on average
6.2days
back in production
121wells

How the work went

  • Three XJ650 rigs and three crews worked two shifts; a rig move from well to well took 5 hours on average.
  • Cement plugs and isolation jobs were done with our own cementing units.
  • Fluids from the wells went to our treatment pad by vacuum tanker.
  • The client got a daily report for each well and the test result after each job.

Result

146 wells worked over, 121 back in production; 318,000 man-hours without a lost-time injury.

The client’s words
The daily reports let us follow every well from the office and decide without driving out to the field.

The client’s production director

Services

Equipment used

Other projects

Have similar work?

Pick the service, the site and the length: the price with crew and equipment is worked out at once.

Call usMessage on WhatsAppEquipment hireRequest a quote