Balakhani and Sabunchu fields · Onshore
Workover campaign in Balakhani
Three rigs and three crews brought idle wells back into production over 11 months
- Client
- A joint venture working old onshore fields
- Period
- March 2025 – February 2026 (12 months)
- Most people on site in a day
- 58
- Man-hours
- 318,000
- Lost-time injuries
- 0

The brief
More than 170 wells in the Balakhani and Sabunchu fields had stood idle for years. The joint venture picked the most promising and wanted one contractor for the servicing and workover, well kill and cement isolation.
In figures
- worked over
- 146wells
- per well on average
- 6.2days
- back in production
- 121wells
How the work went
- Three XJ650 rigs and three crews worked two shifts; a rig move from well to well took 5 hours on average.
- Cement plugs and isolation jobs were done with our own cementing units.
- Fluids from the wells went to our treatment pad by vacuum tanker.
- The client got a daily report for each well and the test result after each job.
Result
146 wells worked over, 121 back in production; 318,000 man-hours without a lost-time injury.
The daily reports let us follow every well from the office and decide without driving out to the field.
The client’s production director
Services
Equipment used
Other projects

Siyazan district · 2026 · Onshore
Flowline replacement in Siyazan
Pipelines, inspection and NDT, corrosion protection
18.4 km of 6 to 10-inch flowline replaced

Sangachal · 2025 · Onshore
Pump skids built and set in Sangachal
Cranes and heavy lifting, fabrication and welding
3 skids fabricated and tested

Off Pirallahi island · 2025 · Nearshore
Nearshore pipeline repair at Pirallahi
Pipelines, inspection and NDT
2.6 km of 12-inch pipe replaced
Have similar work?
Pick the service, the site and the length: the price with crew and equipment is worked out at once.