Off Pirallahi island · 2025 · Nearshore
Nearshore pipeline repair at Pirallahi
Pipelines, inspection and NDT
2.6 km of 12-inch pipe replaced
Compressor · 27.6 m³/min
High-pressure compressor for blasting, pipeline cleaning and drying, and pneumatic tests
excl. VAT

Free and busy days from today. Pick a day and the length: the price is worked out below.
October 2026
November 2026
December 2026
| Hire, 3 days₼480 / day, with operator | ₼1,440 |
|---|---|
| Mobilisation and demobilisation, 22 km | ₼80 |
| Excl. VAT | ₼1,520 |
| VAT 18% | ₼274 |
| Total | ₼1,794 |
Fuel not included.
| Year built | 2021 |
|---|---|
| Free air delivery | 27.6 m³/min at 25 bar |
| Working pressure | Up to 35 bar |
| Comes with | With or without operator |
Figures from the maker’s data.
Lökbatan yard
Salyan highway, km 21, Lökbatan settlement, Garadagh district, Baku
Gate: Mon–Fri 07:00–20:00, Sat 08:00–16:00. Dispatcher: around the clock.
Open in Google Maps
Off Pirallahi island · 2025 · Nearshore
Pipelines, inspection and NDT
2.6 km of 12-inch pipe replaced

Lökbatan yard · 2025 · Onshore
Fabrication and welding, inspection and NDT, corrosion protection
312 t of piping and steelwork

Shirvan · 2024 · Onshore
Corrosion protection, inspection and NDT
9,800 m² blasted and coated