Siyazan district · 2026 · Onshore
Flowline replacement in Siyazan
Pipelines, inspection and NDT, corrosion protection
18.4 km of 6 to 10-inch flowline replaced
Eleven of the projects we finished in the last five years. We do not name clients: our contracts do not allow it. The figures come from the as-built records.

11 projects

Siyazan district · 2026 · Onshore
Pipelines, inspection and NDT, corrosion protection
18.4 km of 6 to 10-inch flowline replaced

Balakhani and Sabunchu fields · 2026 · Onshore
Well services and workover
146 wells worked over

Sangachal · 2025 · Onshore
Cranes and heavy lifting, fabrication and welding
3 skids fabricated and tested

Off Pirallahi island · 2025 · Nearshore
Pipelines, inspection and NDT
2.6 km of 12-inch pipe replaced

Lökbatan yard · 2025 · Onshore
Fabrication and welding, inspection and NDT, corrosion protection
312 t of piping and steelwork

Shirvan · 2024 · Onshore
Corrosion protection, inspection and NDT
9,800 m² blasted and coated

Neftchala district · 2024 · Onshore
Waste treatment
21,400 t of drill cuttings treated

Sumgait · 2023 · Onshore
Cranes and heavy lifting
112 t package weight

Hovsan and Surakhani · 2023 · Onshore
Inspection and NDT, engineering and manpower
41 km of line surveyed

Alat · 2022 · Nearshore
Fabrication and welding, cranes and heavy lifting, corrosion protection
640 m of trestle repaired

Baku · 2021 · Onshore
Engineering and manpower, inspection and NDT
148 people on site on the busiest day
Pick the service, the site and the length: the price with crew and equipment is worked out at once.